New Generation Float Valve Excels in Saudi Arabia
Application
9-5/8” Casing with Drilling
Multi-stage Cementing
Technology
Float Valve
Conventional Float Equipment
Locations
Saudi Arabia
Well - ABHD-174
Customer Challenge
During casing operations for 9-5/8” deployment, the objective was to isolate the water sensitive Wasia and Biyadh shales and close off the lost circulation zones across the Shu’aiba formation.
Key Challenges of the Various Zone Formations:
Safaniya Formation: Caving’s & Water Influx
Lower Aruma: Shales
Wasia & Biyadh (Water Sensitive): Bit Balling
Shuaiba: Loss Circulation Zones
VES Performance
Previous Casing Shoe Depth (13-3/8”): 4225’ 9-5/8” Total Depth: 6780’
Length Drilled conventionally: 1773’ (till 5998’)
Length Drilled by CwD: 782’ (till 6780’) 12-15 BPM
VES Equipment utilized: 9.625”, 43.5 PPF, BTC, L80 FLOAT COLLARS (2 Each)
FLOAT EQUIPMENT Operation: 60 Hours
(Pick up CwD to displace first stage cement)
Case Study #2
CUSTOMER CHALLENGE
During casing operations for 13-3/8” deployment, the objective was to sut off the lost circulation in the ARUMA and WASIA formations and prevent the WASIA formation from charging the upper formations / isolate the water sensitive WASIA shales.
Key Challenges of the Various Zone Formations:
Aruma: Loss Circulation Zones
Aruma & Wasia: Tight spots / Stuck Pipe
VES PERFORMANCE
Previous Casing Shoe Depth (18-5/8”): 75’ 13-3/8”
Total Depth: 1764’
Length Drilled conventionally: 875’ (till 950’) (had complete losses at 140’).
Length Drilled by CWD: 814’ (till 1764’) =<19 BPM
VES Equipment utilized: 13.375”, 68 PPF, BTC, J55 FLOAT COLLARS (2 Each)
FLOAT EQUIPMENT Operation: 32 Hours (Pick up CWD to displacing first stage Cement)